A. Condotta, S. Knust, N.V. Shakhlevich:
Parallel batch scheduling of equal-length jobs with release and due dates
Journal of Scheduling 13 (2010), 463-477.
DOI:10.1007/s10951-010-0176-y
S. Knust:
Scheduling non-professional table-tennis leagues
European Journal of Operational Research 200 (2010), 358-367.
DOI:10.1016/j.ejor.2009.01.015
G. Kendall, S. Knust, C.C. Ribeiro, S. Urrutia:
Scheduling in sports: An annotated bibliography
Computers and Operations Research 37 (2010), 1-19.
DOI:10.1016/j.cor.2009.05.013
D. Briskorn, S. Knust:
Constructing fair sports league schedules with regard to strength groups
Discrete Applied Mathematics 158 (2010), 123-135.
DOI:10.1016/j.dam.2009.08.006
S. Knust, D. Lücking:
Minimizing costs in round robin tournaments with place constraints
Computers and Operations Research 36 (2009), 2937-2943.
DOI:10.1016/j.cor.2009.01.004
A. Drexl, S. Knust:
Sports league scheduling: graph- and resource-based models
Omega 35 (2007), 465-471.
DOI:10.1016/j.omega.2005.08.002
S. Knust, M. von Thaden:
Balanced home-away assignments
Discrete Optimization 3 (2006), 354-365.
DOI:10.1016/j.disopt.2006.07.002
P. Brucker, S. Knust, C. Oguz:
Scheduling chains with identical jobs and constant delays on a single machine
Mathematical Methods of Operations Research 63 (2006), 63-75.
DOI:10.1007/s00186-005-0014-8
P. Brucker, S. Knust, G. Wang:
Complexity results for flow-shop problems with a single server
European Journal of Operational Research 165 (2005), 398-407.
DOI:10.1016/j.ejor.2004.04.010
J. Hurink, S. Knust:
Tabu search algorithms for job-shop problems with a single transport robot
European Journal of Operational Research 162 (2005), 99-111.
DOI:10.1016/j.ejor.2003.10.034
P. Brucker, T.C.E. Cheng, S. Knust, N.V. Shakhlevich:
Complexity results for flow-shop and open-shop scheduling problems with transportation delays
Annals of Operations Research 129 (2004), 81-106.
DOI:10.1023/B:ANOR.0000030683.64615.c8
P. Baptiste, P. Brucker, S. Knust, V.G. Timkovsky:
Ten notes on equal-processing-time scheduling
Quarterly Journal of the Belgian, French and Italian Operations
Research Societies (4OR) 2 (2004), 111-127.
DOI:10.1007/s10288-003-0024-4
P. Brucker, S. Knust:
Lower bounds for resource-constrained project scheduling problems
European Journal of Operational Research 149 (2003), 302-313.
DOI:10.1016/S0377-2217(02)00762-2
P. Brucker, J. Hurink, S. Knust:
A polynomial algorithm for P | pj=1, rj, outtree |
sum Cj
Mathematical Methods of Operations Research 56 (2002), 407-412.
DOI:10.1007/s001860200228
P. Brucker, S. Knust:
Lower bounds for scheduling a single robot in a job-shop environment
Annals of Operations Research 115 (2002), 147-172.
DOI:10.1023/A:1021149204501
P. Brucker, S. Heitmann, S. Knust:
Scheduling railway traffic at a construction site
OR Spectrum 24 (2002), 19-30.
DOI:10.1007/s291-002-8198-0
P. Brucker, C. Dhaenens-Flipo, S. Knust, S.A. Kravchenko, F. Werner:
Complexity results for parallel machine problems with a single server
Journal of Scheduling 5 (2002), 429-457.
DOI:10.1002/jos.120
J. Hurink, S. Knust:
A tabu search algorithm for scheduling a single robot in a job-shop environment
Discrete Applied Mathematics 119 (2002), 181-203.
DOI:10.1016/S0166-218X(01)00273-6
J. Hurink, S. Knust:
Makespan minimization for flow-shop problems with transportation times and a single robot
Discrete Applied Mathematics 112 (2001), 199-216.
DOI:10.1016/S0166-218X(00)00316-4
J. Hurink, S. Knust:
List scheduling in a parallel machine environment with precedence constraints and setup times
OR Letters 29 (2001), 231-239.
DOI:10.1016/S0167-6377(01)00104-3
P. Brucker, S. Knust:
A linear programming and constraint propagation-based lower bound for the RCPSP
European Journal of Operational Research 127 (2000), 355-362.
DOI:10.1016/S0377-2217(99)00489-0
P. Brucker, S. Knust, D. Roper, Y. Zinder:
Scheduling UET task systems with concurrency on two parallel identical processors
Mathematical Methods of Operations Research 52 (2000), 369-387.
DOI:10.1007/s001860000089
P. Brucker, S. Knust:
Complexity results for single-machine problems with positive finish-start time-lags
Computing 63 (1999), 299-316.
DOI:10.1007/s006070050036
P. Brucker, S. Knust, A. Schoo, O. Thiele:
A branch and bound algorithm for the resource-constrained project scheduling problem
European Journal of Operational Research 107 (1998), 272-288.
DOI:10.1016/S0377-2217(97)00335-4
S. Knust:
Scheduling of Tournaments or Sports Leagues
in: B. Vöcking, H. Alt, M. Dietzfelbinger, R. Reischuk, C. Scheideler,
H. Vollmer, D. Wagner (eds.):
Algorithms Unplugged,
Springer, 2011.
S. Knust:
"Diskret" optimierte Pläne im Alltag
in: K. Wendland, A. Werner (eds.):
Facettenreiche Mathematik - Einblicke in die moderne mathematische Forschung,
Vieweg+Teubner, 2011.
P. Brucker, S. Knust:
On the complexity of scheduling
in: Y. Robert, F. Vivien (eds.): Introduction to Scheduling,
Chapman and Hall/CRC Press.
CRC Press, 2009.
S. Knust:
Turnier- und Sportligaplanung
in: B. Vöcking, H. Alt, M. Dietzfelbinger, R. Reischuk, C. Scheideler,
H. Vollmer, D. Wagner (eds.):
Taschenbuch der Algorithmen,
Springer, 2008.
P. Brucker, S. Knust:
Scheduling
in Theme 6.5. Optimization and Operations Research, edited by U. Derigs, in Encyclopedia of Life Support Systems
(EOLSS)
developed under the auspices of the UNESCO, Eolss Publishers, Oxford, UK.
P. Brucker, S. Heitmann, S. Knust:
Scheduling railway traffic at a construction site
in: H.-O. Günther, K.H. Kim (eds.):
Container Terminals and Automated Transport Systems Logistics Control Issues and Quantitative Decision Support,
Springer, 2004.
Abstract
P. Brucker, S. Knust:
Resource-constrained project scheduling and timetabling
in: E.Burke, W.Erben (ed.): The Practice and Theory of Automated Timetabling
III, Springer Lecture Notes in Computer Science Vol. 2079, 277-293, 2001.
T. Baar, P. Brucker, S. Knust:
Tabu-search algorithms and lower bounds for the resource-constrained project scheduling problem
in: S.Voss, S.Martello, I.Osman, C.Roucairol (eds.): Meta-heuristics: Advances and
Trends in Local Search Paradigms for Optimization, Kluwer, 1-18, 1998.
Abstract
P. Brucker, S. Knust:
Solving large-sized resource-constrained project scheduling problems
in: J.Weglarz (ed.): Project Scheduling: Recent Models, Algorithms and
Applications, Kluwer, 27-51, 1998.
Miscellaneous
S. Knust:
Shop-scheduling problems with transportation
Dissertation, Fachbereich Mathematik/Informatik, Universität
Osnabrück, 1999.
C. Viergutz, S. Knust:
Integrated production and distribution scheduling with lifespan constraints,
submitted.
Abstract
D. Briskorn, S. Knust:
On circular 2-factorizations of the complete tripartite graph
Manuskripte aus den Instituten für Betriebswirtschaftslehre der Universität
Kiel, No. 636, 2008
Abstract